Community · October · Communications & Community

October open house at the visitor center

The visitor center opens its doors on a Saturday for the whole South Coast: the model control room, the fuel assembly mock-up, the estuary team's tanks and the line crew's bucket truck in the lot.

The visitor center: a timber-and-glass building on the bluff with the model control room visible inside

Once a year the visitor center sets aside the appointment book and opens for everybody. The model control room runs its scripted shift, with an operator from one of the real crews beside it to answer questions; the full-scale fuel assembly mock-up is out of its case; the estuary team brings the tanks from the Sixes River monitoring station; and a line crew parks a bucket truck in the lot for anyone who wants to see what the work looks like from the top.

The open house is for all ages. The plant tour, which goes inside the protected area, is not part of it: those are booked separately, for visitors eighteen and over, through the tour desk.

Parking is at the visitor center and in the overflow lot on Sixes River Station Road, with a shuttle from the Langlois fire station for anyone who would rather not drive in. Coffee and chowder come from the harbor, and the Sixes River Fund's grant recipients have a table each.

Hours and the shuttle schedule are posted at the visitor center page and on the recorded line, (696) 412-0530.

Questions about this notice go to the Communications & Community office, (696) 412-0540, community@oregonnuclear.com. All notices.

More notices

From the station

All notices
  • A line crew in a bucket truck working on a pole beside the highway in low coastal light

    Your power · Before the storm season

    Before the winter storms: how the loop gets ready

    Trimming, pole inspections, spare transformers in every yard and a storm roster of crews: what Grid Operations does every autumn before the first big Pacific system arrives.

    Read more
  • The intake structure on the shore: screens and pumps in a concrete building, surf beyond

    Environment · Late summer

    A late-summer kelp bloom on the intake screens

    Warm water and a run of calm days sent more drift kelp than usual into the offshore intake. The traveling screens handled it, and every strand went back to the sea.

    Read more
  • The dry cask pad: a row of tall grey concrete casks on a slab inside the fence, the sea behind

    The station · Summer

    Four more casks on the pad

    This summer's loading campaign moved the oldest used fuel from the Unit 1 pool into four steel-and-concrete casks. The pad now holds 28.

    Read more